“It has been a pleasure working with you for the last couple of years. I’ve never had any doubt that you were doing what was right for Aethon on our projects. You’ve been responsive and managed the projects with minimal direction from me providing the quality of product that I expected.”
Read the Case StudyHGA consistently meets or exceeds contract performance measures and provides project inception to completion and program administration expertise.
Read the Case StudyHGA’s design team proved invaluable in the development of the detailed process design for Tetra’s Calcium Chloride project. Their work was excellent. The HGA team was very professional in all aspects of the project. They provided an onsite team to perform construction management for the project worth $135M. The project was on budget and on time due in no small part to their efforts. I would highly recommend HGA for any project. They have the proven capability to handle all aspects of a project from start to finish!
Read the Case StudyHGA provided detailed engineering services including civil/structural, mechanical, piping, electrical, instrumentation, controls, and design of interface necessary for connection to main-line tie points.
Read the Case StudyHGA provided the project management, detailed engineering, field services, procurement, and project controls for a gathering system in south Texas.
Read the Case StudyHGA provided the project management, detailed engineering, field services, procurement support, and project controls for 30-in. and 36-in. segments, along with two compressor stations.
Read the Case StudyHGA personnel have engineered and designed over 100 transmission meter and interconnects.
Read the Case StudyHGA provided the project management, engineering, surveying, land services, project controls, and cost estimating for the FEED services associated with a FERC 7C filing for an LNG project.
Read the Case StudySpearheading efforts funded by FEMA, HGA has assumed responsibility for GOSR’s Public Assistance (PA) Match Program, nearly doubling the realized match in just one year and yielding an estimated $7-10 million in cost savings. Similarly, HGA was instrumental in FEMA’s approval of a pioneering Hazard Mitigation Grant Program (HMGP) Match, which enabled GOSR to bank more than $100 million that could then be put toward additional housing needs.
Read the Case Study