HGA’s Pipeline Services staff provided engineering, project
management, design/drafting, and project controls for a 101
mile 20-, 24-, and 30-in. pipeline through western Georgia.
Specifics of the project are as follows:
- FERC 7c Filing Support
- Routing and Workspace Definition
- 9 HDDs
- 11 Valve Settings
- 6 Launcher/Receivers
- 269 Waterbody Crossings
- 63 Wetland Crossings
- 250 FERC Alignment Sheets
- 198 Powerline Co-location Plans
- 200 Acquisition Drawings
- 207 Wetland/Stream Crossing Drawings
- 40 Road/RR Permit Drawings