Tetra Technologies Calcium Chloride Plant Project

Social Share:

HGA provided project management, engineering, project controls, procurement, and construction management services for Tetra Technologies new, state-of-the-art calcium chloride production facility in El Dorado, Arkansas. The plant will have the capacity to produce liquid calcium chloride and flake calcium chloride.

Scope

  • EPCM (Engineering, Procurement, Construction Management)
  • Preliminary and detailed Engineering Services
  • Project Controls Tracking and Reporting
  • Progress Curves/Trend Analysis
  • Cost Reporting
  • Scheduling and Planning
  • Equipment/Procurement Tracking
  • Construction Management
  • QA/QC and Procurement Services

HGA’s design team proved invaluable in the development of the detailed process design for Tetra’s Calcium Chloride project. Their work was excellent. The HGA team was very professional in all aspects of the project. They provided an onsite team to perform construction management for the project worth $135M. The project was on budget and on time due in no small part to their efforts. I would highly recommend HGA for any project. They have the proven capability to handle all aspects of a project from start to finish!

Jim Tidwell
General Manager