Customer challenge
As global demand for biomass continues, Drax wanted to increase the 250,000-ton manufacturing capacity at its Aliceville, Alabama wood pellet plant by nearly 50%. The expansion would include upgrades to existing systems as well as new truck dumps and pelletizer units, which will allow for an increase in the amount of sawmill residuals processed.

Near the end of the expansion project, Drax required over a 30-day outage to tie in many of the new and existing components of the facility that were modified as part of the expansion. Drax needed to increase the size of its construction management team. However, using their employees was impractical for their solution.

Drax was looking to add three construction managers and one HSE resource to help meet the increasing project demands. These resources were needed before the outage began, and some were required to remain after the outage. During the plant outage, this new, augmented team would be expected to work 12-hour shifts, 7 days per week, for a 6+ week duration and would ideally be able to meet the increased demands for the plant expansion.

Considering the urgency of this need, combined with limited resource availability, Drax did not have the bandwidth to hire technical experts in-house. They needed another solution. They reached out to HGA Staffing Solutions.

Our solution
To meet the project scheduling objective for their plant expansion, HGA Staffing Solutions was able to select three expert construction managers and one HSE manager from a carefully curated list of qualified candidates. With HGA’s staff augmentation services, Drax was effectively able to fill its talent gap and save a lot of time and effort. By choosing HGA’s staff augmentation services, Drax expanded the capabilities of its team and cost-effectively filled out the capacity of its current workforce.

Value delivered
HGA understood Drax’s requirement to provide qualified candidates from our talent pool in under a week to drive operational efficiencies. To meet the schedule, HGA was able to leverage our candidate database and provided a specially curated list of talent that aligned with the company’s unique project needs. Because of these efforts, HGA found the key specialists to join the team and were able to help Drax easily achieve their project goals.

With the right talent on the team, the Drax Senior Project Manager stated that “all of your resources did exactly what was asked of them, performed their duties admirably, and we would absolutely work with them again on future projects or needs.”

With HGA staffing solutions as a strategic partner, Drax was able to lower overhead costs and get top-quality staff, and resources that delivered high-value services.