Provided the project management, detailed engineering, construction management, field services, procurement, and project controls for approximately 20 miles of pipeline, along with launcher/receiver facilities, mainline valve settings and regulation/gas treating facilities to deliver gas to a power generating facility in Atlanta, Georgia.
The scope of services included:
- 19.9 miles of 30-in. OD pipeline
- 20 HDD’s averaging 1,800 feet
- Launcher, Receiver and two (2) each Mainline Valve Settings
- Regulator Facilities and Gas Conditioning Station at Plant Site
- Drawings including Alignments, Landowner Construction Plats, HDD’s and Permits
- (SWCC, State, City, County Roads, Railroads, Parks Authority) Utility Encroachments (Water Lines, Storm Sewers, Sanitary Sewers)
- GA Power Structure Encroachment Details and urban right of way clearing details
- Instrumentation and Electrical for Station Control SNG Delivery Point and Plant Site- Gas Chromatographs (2 each), RTU Packages
- Cathodic Protection System and AC Mitigation System
- Remote Operated Valve Settings at launcher and receiver and MLV’s
- Total Drawing count – in excess of 1,400 individual drawings (not including property plats)