Southern Company-Georgia Power Plant McDonough

Social Share:

Provided the project management, detailed engineering, construction management, field services, procurement, and project controls for approximately 20 miles of pipeline, along with launcher/receiver facilities, mainline valve settings and regulation/gas treating facilities to deliver gas to a power generating facility in Atlanta, Georgia.

The scope of services included:

  • 19.9 miles of 30-in. OD pipeline
  • 20 HDD’s averaging 1,800 feet
  • Launcher, Receiver and two (2) each Mainline Valve Settings
  • Regulator Facilities and Gas Conditioning Station at Plant Site
  • Drawings including Alignments, Landowner Construction Plats, HDD’s and Permits
  • (SWCC, State, City, County Roads, Railroads, Parks Authority) Utility Encroachments (Water Lines, Storm Sewers, Sanitary Sewers)
  • GA Power Structure Encroachment Details and urban right of way clearing details
  • Instrumentation and Electrical for Station Control SNG Delivery Point and Plant Site- Gas Chromatographs (2 each), RTU Packages
  • Cathodic Protection System and AC Mitigation System
  • Remote Operated Valve Settings at launcher and receiver and MLV’s
  • Total Drawing count – in excess of 1,400 individual drawings (not including property plats)