Maverick Basin Development

Social Share:

HGA provided the project management, detailed engineering, field services, procurement, and project controls for a gathering system in south Texas totaling 230 miles of pipeline ranging from 6- to 30-in., along with multiple compression facilities and a central oil and liquids handling facility for the Maverick basin development.

For this project in South Texas, we assisted with:

  • Detailed Engineering Services for both Pipeline and Facilities
  • Route Selection
  • Surveying – Preliminary thru Construction
  • Procurement Support
  • Project Controls Tracking & Reporting
  • Progress Curves/Trend Analysis
  • Scheduling & Reporting
  • Job Books

HGA provided the project management, detailed engineering, field services, procurement, and project controls for a gathering system in south Texas.

Tony Phillips
Senior Construction ManagerAnadarko