HGA provided the project management, detailed engineering, field services, procurement, and project controls for a gathering system in south Texas totaling 230 miles of pipeline ranging from 6- to 30-in., along with multiple compression facilities and a central oil and liquids handling facility for the Maverick basin development.
For this project in South Texas, we assisted with:
- Detailed Engineering Services for both Pipeline and Facilities
- Route Selection
- Surveying – Preliminary thru Construction
- Procurement Support
- Project Controls Tracking & Reporting
- Progress Curves/Trend Analysis
- Scheduling & Reporting
- Job Books