Improving Service Quality and Engineering Design Efficiency

Social Share:

Initially, Aethon’s Engineering Manager Steve Daniel approached HGA for help in development and design services. Aethon Energy needed to have as-built drawings created for a well pad they acquired in the Haynesville Shale area and hired us to provide them. Aethon was very pleased with the results.

Since then, Aethon made the decision to use HGA to provide as-built services for 15 well pads and has nine more slated. As a result of our superior performance, Aethon hired HGA to provide Engineering Procurement and Construction Management (EPCM) services for a 10-mile pipeline, a dehydration facility, and a meter and interconnect facility. Due to our excellent project team, which was centered around HGA’s core values of Customer Service, Cost Effective, Professional Excellence, Teamwork, Trust, and Safety, Aethon continues to contract with HGA for EPCM services for their Pipeline and Facilities projects in North Louisiana and East Texas. Currently, there are two additional pipelines that are in design and construction as well as a greenfield processing facility in design in Aethon’s East Texas area of operations. Also, several plant expansions and another greenfield plant are slated for design services in East Texas and Louisiana in the near future. In addition to the well pad as-built and EPCM services being provided, HGA has also been engaged to assist Aethon with their right of way and land acquisition efforts for current and future expansion projects.

HGA professionals helped with:

  • Detailed engineering services for both pipeline and facilities
  • Total Installed Cost (TIC) estimate
  • Surveying – preliminary thru construction
  • Procurement support
  • Project controls tracking and reporting
  • Progress curves/trend analysis
  • Scheduling and reporting
  • Construction management
  • Job books

“It has been a pleasure working with you for the last couple of years. I’ve never had any doubt that you were doing what was right for Aethon on our projects. You’ve been responsive and managed the projects with minimal direction from me providing the quality of product that I expected.”

Steven Daniel
Facility Engineering ManagerAethon Energy