12-in. Alagasco Montgomery Expansion

Social Share:

HGA provided engineering, project management, design/drafting for the 11 mile 12-in. pipeline through Montgomery and Elmore Counties, Alabama.

The scope of services included:

    • Routing and workspace definition
    • 5 HDDs including Tallapoosa River crossing
    • 3 valve settings including hot tap of existing pipeline regulator station
    • 80 acquisition drawings
    • 12 Road/RR permit drawings