HGA provided engineering, project management, design/drafting for the 11 mile 12-in. pipeline through Montgomery and Elmore Counties, Alabama.
The scope of services included:
- Routing and workspace definition
- 5 HDDs including Tallapoosa River crossing
- 3 valve settings including hot tap of existing pipeline regulator station
- 80 acquisition drawings
- 12 Road/RR permit drawings